Comments on this forum should never be taken as investment advice.
|
|
Thread Tools | Display Modes |
#1
|
|||
|
|||
ASX: GGG progress update
http://www.ggg.gl/docs/ASX-announcem...Oct%202014.pdf
Summary: Process Plant engineering design by Tetra Tech progressing; Concentrator and Refinery mechanical design is largely complete Optimal shipping solution study by Denmark?s Blue Water Shipping complete Greenland port study by Danish engineering firm Ramboll on schedule for completion in December, 2014 Residue storage facility design by AMEC advancing and set for completion in December, 2014 Assay program on previously drilled cores set for completion in November, 2014 Mine design and scheduling commenced with SRK; outputs to include capital and operating costs for an open‐pit mining operation, and establishment of a mining reserve
Disclaimer: The author of this post, may or may not be a shareholder of any of the companies mentioned in this column. No company mentioned has sponsored or paid for this content. Comments on this forum should never be taken as investment advice. |
|
|