Australian Rare Earths

Australian Alternative Energy Forum


Not Really a Forum, more of my memory aid.


Comments on this forum should never be taken as investment advice.


Go Back   Alternative Energy Forums > Alternative Energy Discussion > Australian Rare Earths

Reply
 
Thread Tools Display Modes
  #1  
Old 10-23-2014, 04:27 AM
Sparty Sparty is offline
Administrator
 
Join Date: Mar 2009
Posts: 1,765
Default ASX: GGG progress update

http://www.ggg.gl/docs/ASX-announcem...Oct%202014.pdf

Summary:

Process Plant engineering design by Tetra Tech progressing; Concentrator and Refinery mechanical design is largely complete

Optimal shipping solution study by Denmark?s Blue Water Shipping complete

Greenland port study by Danish engineering firm Ramboll on schedule for completion in December, 2014

Residue storage facility design by AMEC advancing and set for completion in December, 2014

Assay program on previously drilled cores set for completion in November, 2014

Mine design and scheduling commenced with SRK; outputs to include capital and operating costs for an open‐pit mining operation, and establishment of a mining reserve

 

Disclaimer: The author of this post, may or may not be a shareholder of any of the companies mentioned in this column. No company mentioned has sponsored or paid for this content. Comments on this forum should never be taken as investment advice.

Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT. The time now is 04:50 PM.


Powered by vBulletin® Version 3.8.1
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.