Default How ready are the new power plants for CCS?

Retrofitting CCS machinery and equipments to old power plants is always going to be clumsy and costly, and uncertain as well. But, are the new power plants going to do much better when it comes to installing CCS systems? Will they be "shovel ready" in that CCS systems could be installed in them far more easily?

For instance, this article (see the article Sargas Technology ? Carbon Capture Under $20 Per Ton? ) claims that a particular technology from Sargas will work with new pressurised fluidized bed combustion systems much more easily because the technology requires the flue gas to be under pressure to work. Similarly, it is well known that IGCC power plants are far more easily amenable to CCS than are the old PC plants.

What are your thoughts on the readiness of the new power plants for CCS? Do you think they are as shovel ready as they are claimed to be?
Reply With Quote
Old 01-31-2011, 12:18 PM
Sparty Sparty is offline
Join Date: Mar 2009
Posts: 1,119
Default CCS shovel ready?

I have removed this reply......
Reply With Quote

carobn, power plant

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump

All times are GMT. The time now is 03:43 AM.

Powered by vBulletin® Version 3.8.1
Copyright ©2000 - 2018, Jelsoft Enterprises Ltd.